A selection of works we have completed for municipalities, institutions and private investors.

Water Management Structure of the Year 2018
Water Management Structure of the Year 2018

Ostravice Staré Město — reconstruction of the drop structure

Awarded by the Czech Water Management Association (SVH ČR) and SOVAK in the category of structures for impounding, retaining and regulating surface water and flood protection (investment cost under CZK 50 million). Client Povodí Odry, s. p.; contractor: consortium of Zvánovec a.s. and Lesostavby Frýdek-Místek, a.s.

View the diploma
  • ČOV Skočice
    Environmental & WWTP07/2025 – 05/2026

    ČOV Skočice

    Client: Obec Skočice

    k. ú. Skočice

    Capacity
    200 EO
    Sewer pipe
    202 m

    Construction of a mechanical-biological wastewater treatment plant for 200 PE with a storm overflow chamber on the inlet, including civil works and process technology.

  • Water management09/2025 – 03/2026

    Odbahnění a rekonstrukce MVN Rasochy (Návesní)

    Client: Obec Uhlířská Lhota

    k. ú. Rasochy a Uhlířská Lhota

    Sediment removed
    852 m³
    Stone pitching
    324 m³

    Reconstruction of a small reservoir dam including its functional structures and quarry-stone bank protection, desilting of the reservoir and a permanent access ramp.

  • Environmental & WWTP04/2025 – 06/2025

    Vodňany, Křtětice — prodloužení vodovodu

    Client: Město Vodňany

    k. ú. Křtětice

    Water main
    722 m
    Connections
    23 ks
    Directional drilling
    591 m

    Extension of the water main in PE 100RC pipe, 23 house connections, horizontal directional drilling under road III/02223 and reinstatement of asphalt surfaces.

  • Rybník Okoř — obohacení vodního režimu
    Water management10/2022 – 03/2024

    Rybník Okoř — obohacení vodního režimu

    Client: Kavyl, spol. s r.o.

    k. ú. Okoř, PP Zákolanský potok

    Sediment removed
    32 968 m³
    Placed in the dam
    2 319 m³
    Spillways
    2

    Reconstruction and desilting of a pond within a protected landscape feature: reshaping of the basin and banks, dam repair, two new spillways and an outlet structure, brook widening and repair of small bridges.

  • VN PP Třebánky v ř. km 4,3 — kaskáda pěti rybníků
    Water management03/2022 – 09/2023

    VN PP Třebánky v ř. km 4,3 — kaskáda pěti rybníků

    Client: Lesy České republiky, s. p.

    k. ú. Obora u Hracholusk, okres Prachatice

    Reservoirs restored
    5
    Dam sealing core
    5 024 m³
    Dam lengths
    55–88 m

    Restoration of an original 16th-century cascade of five historic ponds: new homogeneous earthfill dams, bottom outlets with reinforced-concrete monks and free-overflow spillways.

  • Revitalizace návesního rybníka v obci Zaječice
    Water management01/2023 – 05/2023

    Revitalizace návesního rybníka v obci Zaječice

    Client: Město Pyšely

    intravilán obce Zaječice

    Sediment removed
    272 m³
    Reinforced concrete
    81 m³

    Desilting of the village pond, a new spillway and combined bottom-outlet structure, and replacement of the stone retaining wall with a reinforced-concrete wall faced in quarry stone.

  • VN Rybná — rekonstrukce přelivu, výpusti a hráze
    Water management02/2022 – 06/2023

    VN Rybná — rekonstrukce přelivu, výpusti a hráze

    Client: Lesy České republiky, s. p.

    k. ú. České Velenice, okres Jindřichův Hradec

    Placed in the dam
    625 m³
    Trees felled
    152 ks

    Reconstruction of the spillway and bottom outlet, dam body repair with stone-paved upstream face, a new DN 400 monk, and a reinforced-concrete spillway with chute and stilling basin.

  • Environmental & WWTP10/2020 – 07/2021

    Střítež — kanalizace Raveň

    Client: Obec Střítež

    k. ú. Střítež u Kaplice a Pořešín

    Gravity sewer
    1 174 m
    House connections
    26 ks
    Pumping station
    1

    New gravity and pressure sewerage in the Raveň district connected to the Kaplice-nádraží WWTP, a bore under road I/3, a precast-concrete pumping station and surface reinstatement.

  • Environmental & WWTP10/2019 – 10/2020

    Krasejovka — čistírna odpadních vod a kanalizace

    Client: Obec Kamenný Újezd

    k. ú. Krasejovka

    WWTP capacity
    150 EO
    Gravity sewer
    0,9 km

    Construction of a mechanical-biological WWTP for 150 PE and a gravity sewer, including a crossing with a trunk water main and a pipe-jacked crossing under a first-class road.

  • Rybník Hnačov — přeliv, výpusti a hráz
    Water management10/2019 – 09/2020

    Rybník Hnačov — přeliv, výpusti a hráz

    Client: Klatovské rybářství – správa a.s.

    k. ú. Hnačov, okres Klatovy

    Earth dam
    8 658 m³
    Reinforced concrete
    160 m³

    Rebuilt spillway, new outlet structures with a concrete-encased DN 550 pipe, and levelling and raising of the dam crest with a new crushed-stone road.

  • Water management10/2019 – 06/2020

    Pasecký rybník — obnova zaniklé nádrže a obslužná komunikace

    Client: Obec Paseky

    k. ú. Paseky

    Excavation in the basin
    8 221 m³
    Dam length
    73 m
    Reinforced concrete
    372 m³

    Restoration of a vanished reservoir: a homogeneous earthfill dam with crushed-stone facing, a concrete combined outlet structure with a 2 × 6 m spillway and a new access road.

  • Water management

    Ostravice Staré Město — rekonstrukce spádového stupně

    Client: Povodí Odry, státní podnik

    řeka Ostravice, Staré Město

    Award
    Vodohospodářská stavba roku 2018

    Reconstruction of a drop structure on the Ostravice river, delivered in a consortium with Lesostavby Frýdek-Místek, a.s. Named Water Management Structure of the Year 2018 (SVH ČR and SOVAK) in the category of structures for impounding, retaining and regulating surface water with investment cost under CZK 50 million.

    Completed 2018
  • Water management11/2012 – 07/2015

    Revitalizace části regionálního biocentra Šiberna

    Client: Město Benešov

    k. ú. Benešov, severní část zámeckého parku

    Sediment removed
    125 900 m³
    Pond area
    20 ha

    Full-area sediment removal (partly by suction dredger), repair of the dam, outlet and spillway, bank erosion repairs and replanting.

  • Kocába, ř. km 0,00–4,60 — oprava opevnění koryta
    Water management02/2015 – 07/2016

    Kocába, ř. km 0,00–4,60 — oprava opevnění koryta

    Client: Povodí Vltavy, státní podnik

    k. ú. Štěchovice u Prahy a Masečín

    Length of reach
    4,6 km
    Stone pitching
    min. 500 kg/kus

    Channel repair from the Vltava confluence to the ford at Havran — stone pitching and rip-rap, reinforced-concrete sills and paving, bank stabilisation and removal of deposited sediment.

  • Environmental & WWTP07/2014 – 11/2014

    Úpravna vody Častolovice

    Client: DSO „Obecní voda“

    k. ú. Častolovice a Hřibiny

    Scope
    vodojem · úpravna · vrtaná studna

    Construction of a reservoir and water treatment plant including a drilled well, process technology and electrical installation.

  • Water management12/2013 – 09/2015

    Revitalizace Litovického potoka v k. ú. Hostivice

    Client: Město Hostivice

    k. ú. Hostivice

    Route length
    2 361 m
    Floodplain restored
    6,8 ha

    Stream and floodplain restoration — morphological and hydraulic diversity, new pools and islets, migration permeability, and improved flood protection for the built-up area.

  • Environmental & WWTP12/2014 – 08/2015

    Hluboká nad Vltavou — obnova kanalizačních sběračů po povodni a obnova vodovodu Zborovská

    Client: Město Hluboká nad Vltavou

    Hluboká nad Vltavou

    Sewer DN 500
    627 m
    Trenchless
    117 m
    Water main (cast iron)
    134 m

    Renewal of flood-damaged sewer collectors using GRP liners, new manholes, reconnection of house connections and water-main renewal.

  • Water management10/2014 – 04/2015

    Lužnice, ř. km 1,590–2,830, levý břeh, Koloděje n. L. — stabilizace břehových nátrží

    Client: Povodí Vltavy, státní podnik

    Koloděje nad Lužnicí

    Length of reach
    1,24 km
    Planting
    25 ks dubu

    Stabilisation of eroded left-bank sections of the Lužnice with heavy rip-rap gravelled up to the bank edge, complemented by riparian planting.

  • Water management09/2014 – 11/2015

    Revitalizace Žlebského potoka a přilehlých mokřadů v nivě Vltavy

    Client: Správa Národního parku Šumava

    k. ú. České Žleby, II. zóna NP Šumava, biosférická rezervace UNESCO

    Protected species
    perlorodka říční

    Restoration of channel-forming processes and hydrology in the stream floodplain, renewal of alluvial wetlands and improved water retention, including measures for the freshwater pearl mussel.

  • Water management10/2014 – 11/2015

    Jedlový potok — revitalizace

    Client: Správa Národního parku Šumava

    blízko osady Stögerova Huť, NP Šumava

    Scope
    rybí přechod · tůně

    Stream and floodplain restoration with a fish pass and pools supporting brown trout spawning, slowing the passage of flood flows.

  • Water management10/2014 – 10/2015

    Rybník Sobětice

    Client: Město Klatovy

    k. ú. Sobětice

    Sediment removed
    4 076 m³

    Sediment removal, upstream slope regrading, a new reinforced-concrete monk outlet and shaft spillway.

  • Environmental & WWTP08/2015 – 10/2015

    Obnova vodovodu u nádraží Sepekov

    Client: Městys Sepekov

    Sepekov

    Water main
    450 m
    Connections
    36 ks

    Replacement of the original water main along its existing route, including reconnection of every service connection.

    860,641 CZK
  • Kanalizace a ČOV Zbytiny
    Environmental & WWTP

    Kanalizace a ČOV Zbytiny

    Client: Obec Zbytiny

    Completed 20. 11. 2008
  • VD Vřesník — odtěžení nánosů
    Water management

    VD Vřesník — odtěžení nánosů

    Client: Povodí Vltavy, státní podnik

    Completed 8. 9. 2010
  • Land restoration

    Obnova rybníka Divák

    Client: Rybářství Lnáře, s. r. o.

    Completed 10. 11. 2009
  • Environmental & WWTP

    Kanalizace a vodovod Vlachovo Březí

    Client: Město Vlachovo Březí

    Completed 5. 10. 2009

We build for

  • Obec Skočice
  • Obec Uhlířská Lhota
  • Město Vodňany
  • Kavyl, spol. s r.o.
  • Lesy České republiky, s. p.
  • Město Pyšely
  • Obec Střítež
  • Obec Kamenný Újezd
  • Klatovské rybářství – správa a.s.
  • Obec Paseky
  • Povodí Odry, státní podnik
  • Město Benešov
  • Povodí Vltavy, státní podnik
  • DSO „Obecní voda“
  • Město Hostivice
  • Město Hluboká nad Vltavou
  • Správa Národního parku Šumava
  • Město Klatovy
  • Městys Sepekov
  • Obec Zbytiny
  • Rybářství Lnáře, s. r. o.
  • Město Vlachovo Březí